 "schema": "kwhlab-mindmap/0.1 (article display copy)",
 "source_file": "20_draft/mindmap_v11.json",
 "ledger_file": "10_research/claim_ledger_v7.csv",
 "transcript_file": "10_research/transcript_claims_v3.csv",
 "version": "v11",
 "content_status": "draft",
 "note": "Draft map for a draft article (content_status: draft). Labels, tags and claim ids from mindmap_v11.json; detail text is still under verification. Do not cite.",
 "nodes": [
  {
   "id": "root",
   "parent": null,
   "label": "Paying people not to use power",
   "type": "root",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How PJM, the grid operator for 13 states and the District of Columbia, came up short on capacity, and how paying homes and businesses to use less at peak fills part of the gap [C13, C11, C30]. Built from the source conversation between host Jigar Shah and Voltus CEO Dana Guernsey, checked against our ledger. Each point carries a tag: Verified, Verified with nuance, Contradicted, or As stated, not independently verified.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t1",
   "parent": "root",
   "label": "The capacity gap",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Why flexibility matters now: PJM's last two capacity auctions came up short, new supply is shrinking, and demand keeps rising [C11, C12, C09]. Capacity here means enough power, in MW (megawatts), for the few hours of highest demand each year. Sources: PJM auction reports, PJM Inside Lines, GE Vernova, Voltus press release (citing NERC).",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t1a",
   "parent": "t1",
   "label": "Load growth forecast",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Forecasts of how fast demand and costs are rising, as the speakers gave them [TC09, TC31, TC29]. None of the three is checked against a primary source; NERC's figure has only second-hand support [C09].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c1a1",
   "parent": "t1a",
   "label": "NERC: peak demand +24%",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC09 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey on NERC (the North American Electric Reliability Corporation): \"says it's going to be 24% over the next decade\" (source conversation, 00:05:57) [TC09]. As stated, not independently verified: our only support is Voltus's press release quoting NERC, and it refers to peak demand, not yearly energy [C09]. The NERC report itself was not checked [C09].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC09",
     "kind": "transcript",
     "timestamp": "00:05:57",
     "ledger_claim_id": "C09",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C09",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    }
   ]
  },
  {
   "id": "c1a2",
   "parent": "t1a",
   "label": "Bills doubling or tripling",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC31 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"electricity bills are—depending on where you are—doubling, tripling\" (source conversation, 00:18:06) [TC31]. As stated, not independently verified: no source was given, so don't read it as a general rule [TC31].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC31",
     "kind": "transcript",
     "timestamp": "00:18:06",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c1a3",
   "parent": "t1a",
   "label": "Business energy costs +5%/yr",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC29 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"for businesses that are seeing like 5% increases in the cost of their energy every year\" (source conversation, 00:17:51) [TC29]. As stated, not independently verified; no source was given [TC29].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC29",
     "kind": "transcript",
     "timestamp": "00:17:51",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t1b",
   "parent": "t1",
   "label": "PJM's auction squeeze",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM buys capacity ahead of time in its Base Residual Auction (BRA), counted in MW UCAP: unforced capacity, megawatts adjusted for how often a resource is actually available [C11]. The 2026/27 auction cleared above the reliability requirement, 2027/28 and 2028/29 came up short, and the price hit the cap [C35, C12, C11, C13]. Sources: PJM BRA reports and PJM news release.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c1b1",
   "parent": "t1b",
   "label": "2026/27: 139 MW above requirement",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C35",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM's 2026/27 auction procured 146,243.8 MW UCAP, 139 MW above the reliability requirement [C35]. So the shortfalls began with the 2027/28 auction [C11, C35]. Source: PJM 2026/27 BRA report (2025-07-22).",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C35",
     "kind": "ledger",
     "source_title": "PJM 2026/2027 Base Residual Auction Report (2025-07-22)",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 9",
     "page_note_url": "#src-9"
    }
   ]
  },
  {
   "id": "c1b2",
   "parent": "t1b",
   "label": "2027/28: 6,516.6 MW short",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C12",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM's 2027/28 auction procured 145,777.1 MW UCAP, 6,516.6 MW UCAP below the reliability requirement [C12]. Source: PJM 2027/28 BRA report.",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C12",
     "kind": "ledger",
     "source_title": "PJM 2028/2029 Base Residual Auction Report",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 1",
     "page_note_url": "#src-1"
    }
   ]
  },
  {
   "id": "c1b3",
   "parent": "t1b",
   "label": "2028/29: 6,831.3 MW short",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC14 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM's 2028/29 auction procured 149,181.6 MW UCAP, 6,831.3 MW UCAP below the reliability requirement [C11]. Shah rounded it on air: \"PJM is saying that they're 6,800 MW short of its reliability target in the last auction\" (source conversation, 00:19:03) [TC14]. Verified; source: PJM 2028/29 BRA report.",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC14",
     "kind": "transcript",
     "timestamp": "00:19:03",
     "ledger_claim_id": "C11",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C11",
     "kind": "ledger",
     "source_title": "PJM 2028/2029 Base Residual Auction Report",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 1",
     "page_note_url": "#src-1"
    }
   ]
  },
  {
   "id": "c1b4",
   "parent": "t1b",
   "label": "Reserve margin 14.7% vs 20%",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C11",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM's estimated reserve margin (spare capacity above expected peak) for 2028/29 is 14.7%, against a 20% target [C11]. It was at or above target in every auction from 2018/19 to 2026/27, and below it in 2027/28 and 2028/29 [C11]. These margins are estimates from the PJM 2028/29 BRA report [C11].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C11",
     "kind": "ledger",
     "source_title": "PJM 2028/2029 Base Residual Auction Report",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 1",
     "page_note_url": "#src-1"
    }
   ]
  },
  {
   "id": "c1b5",
   "parent": "t1b",
   "label": "New supply only 524.7 MW",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC15 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "317.1 MW new plants + 207.6 MW uprates",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "New generation plus uprates (upgrades that get more out of existing plants) came to 524.7 MW UCAP for 2028/29: 317.1 MW of new plants and 207.6 MW of uprates [C12]. Verified with nuance: Shah said \"only 525 MW of new power plants showed up\" (source conversation, 00:19:03), but not all of it is new plants [TC15, C12]. It fell from 2,668.6 MW for 2026/27 and 774.3 MW for 2027/28 (PJM BRA reports) [C35, C12].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC15",
     "kind": "transcript",
     "timestamp": "00:19:03",
     "ledger_claim_id": "C12",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C12",
     "kind": "ledger",
     "source_title": "PJM 2028/2029 Base Residual Auction Report",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 1",
     "page_note_url": "#src-1"
    }
   ]
  },
  {
   "id": "c1b6",
   "parent": "t1b",
   "label": "Price at cap: $325/MW-day",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C13",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "The 2028/29 price hit the cap, $325 per MW-day: a payment per megawatt for each day it is on call [C13]. That is $118,625 per MW per year (own calc: 325 × 365) [C13]. The cap and floor were set with the 13 PJM governors and FERC, and 2028/29 was the third auction under them (PJM news release, 2026-07-14) [C13].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C13",
     "kind": "ledger",
     "source_title": "PJM news release: PJM Capacity Auction Procures 138,318 MW ... (2026-07-14)",
     "source_url": "https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 2",
     "page_note_url": "#src-2"
    }
   ]
  },
  {
   "id": "t1c",
   "parent": "t1",
   "label": "How big is PJM",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM runs the grid and power market for 13 states and the District of Columbia [C13]. Its July 2026 peak was much higher than the figure given on air [C10, C37].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c1c1",
   "parent": "t1c",
   "label": "13 states plus DC",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C13 (label is the ledger fact; TC18 is As stated)",
   "show_tag_basis": true,
   "source_label": null,
   "note": "Serves more than 67 million people (C13); largest-market remark (TC18) as stated",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM serves more than 67 million people across 13 states and the District of Columbia (PJM news release, 2026-07-14) [C13]. Shah described it on air as \"the PJM serves Illinois over to New Jersey and down to Virginia\" and called it the largest market (source conversation, 00:20:35); that remark is as stated, not independently verified [TC18]. Tag basis: the label states the C13 ledger fact, not the on-air remark.",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC18",
     "kind": "transcript",
     "timestamp": "00:20:35",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C13",
     "kind": "ledger",
     "source_title": "PJM news release: PJM Capacity Auction Procures 138,318 MW ... (2026-07-14)",
     "source_url": "https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 2",
     "page_note_url": "#src-2"
    }
   ]
  },
  {
   "id": "c1c2",
   "parent": "t1c",
   "label": "Peak 162,713-168,158 MW, not 130,000",
   "type": "claim",
   "status": "Contradicted",
   "example": false,
   "tag_basis": "TC19 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": "about 130,000 MW (TC19)",
   "corrected_value": "168,158 MW estimated unrestricted; 162,713 MW preliminary served, 2026-07-02 (C10, C37)",
   "ledger_value": null,
   "compare_with": null,
   "detail": "Contradicted: Shah said \"It's about 130,000 MW, I think, of peak\" (source conversation, 00:20:35) [TC19]. PJM estimated an unrestricted peak of 168,158 MW on July 2, 2026, and served a preliminary 162,713 MW [C10, C37]. Sources: PJM Inside Lines (2026-07-10) and PJM's August 3, 2026 operations presentation; both figures are preliminary [C37].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC19",
     "kind": "transcript",
     "timestamp": "00:20:35",
     "ledger_claim_id": "C10; C37",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C10",
     "kind": "ledger",
     "source_title": "PJM Inside Lines: PJM Serves Load Through Record-Breaking July Heat (2026-07-10)",
     "source_url": "https://insidelines.pjm.com/pjm-serves-load-through-record-breaking-july-heat/",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 8",
     "page_note_url": "#src-8"
    },
    {
     "id": "C37",
     "kind": "ledger",
     "source_title": "PJM DISRS presentation: Hot Weather Operations and Load Management Events, July 2-3 (Scott Baker, 2026-08-03)",
     "source_url": "https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/disrs/2026/20260803/20260803-item-05---july-hot-weather-and-load-management-events---presentation.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 12",
     "page_note_url": "#src-12"
    }
   ]
  },
  {
   "id": "t1d",
   "parent": "t1",
   "label": "Gas can't arrive in time",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "New gas plants can't arrive fast enough to close the gap, because turbine orders stretch years ahead [C15, TC21]. Source: GE Vernova 2Q 2026 earnings call.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c1d1",
   "parent": "t1d",
   "label": "GE Vernova: 116 GW orders, reservations",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC20 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Firm orders plus slot reservations, not firm backlog alone",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "GE Vernova reported 116 GW of gas turbine orders plus slot reservations in July 2026 [C15]. Shah: \"GE Vernova is now taking orders for 2031 delivery with a backlog of 116,000 MW\" (source conversation, 00:20:35) [TC20]. Verified with nuance: the 116 GW mixes firm orders and slot reservations, so it is not firm backlog alone (GE Vernova 2Q 2026 earnings call, 2026-07-22) [C15].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC20",
     "kind": "transcript",
     "timestamp": "00:20:35",
     "ledger_claim_id": "C15",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C15",
     "kind": "ledger",
     "source_title": "GE Vernova 2Q 2026 earnings call transcript (2026-07-22)",
     "source_url": "https://www.gevernova.com/sites/default/files/gev_webcast_transcript_07222026.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 3",
     "page_note_url": "#src-3"
    }
   ]
  },
  {
   "id": "c1d2",
   "parent": "t1d",
   "label": "Gas back-ordered to ~2030",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC21 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"they're back-ordered till who knows—2030, whatever\" (source conversation, 00:21:23) [TC21]. As stated, not independently verified: a loose remark; compare GE Vernova, which on its 2Q 2026 call was 'mostly sold out through 30' and taking orders for 2031 delivery [TC21, C15].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC21",
     "kind": "transcript",
     "timestamp": "00:21:23",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t1e",
   "parent": "t1",
   "label": "Heat dome, July 2026",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "On July 2, 2026, in the heat dome, PJM set a demand record and called on demand response [C10, C37, C28]. All the figures are PJM's preliminary estimates [C37, C28].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c1e1",
   "parent": "t1e",
   "label": "Record day: July 2, 2026",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "C10, C37 (preliminary)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Preliminary",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "On July 2, 2026, PJM served a peak of 162,713 MW and estimates demand would have reached 168,158 MW without the load demand response held down, beating the 2006 record of 165,563 MW [C37, C62]. Verified with nuance: these are preliminary figures, from PJM Inside Lines (2026-07-10) and PJM's August 3, 2026 operations presentation [C10, C37]. The numbers are measured differently and don't add up to each other [C10, C37].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C10",
     "kind": "ledger",
     "source_title": "PJM Inside Lines: PJM Serves Load Through Record-Breaking July Heat (2026-07-10)",
     "source_url": "https://insidelines.pjm.com/pjm-serves-load-through-record-breaking-july-heat/",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 8",
     "page_note_url": "#src-8"
    },
    {
     "id": "C37",
     "kind": "ledger",
     "source_title": "PJM DISRS presentation: Hot Weather Operations and Load Management Events, July 2-3 (Scott Baker, 2026-08-03)",
     "source_url": "https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/disrs/2026/20260803/20260803-item-05---july-hot-weather-and-load-management-events---presentation.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 12",
     "page_note_url": "#src-12"
    },
    {
     "id": "C62",
     "kind": "ledger",
     "source_title": "PJM Inside Lines: PJM Serves Load Through Record-Breaking July Heat (2026-07-10)",
     "source_url": "https://insidelines.pjm.com/pjm-serves-load-through-record-breaking-july-heat/",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 8",
     "page_note_url": "#src-8"
    }
   ]
  },
  {
   "id": "c1e2",
   "parent": "t1e",
   "label": "6,113 MW demand response delivered",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "C28 (preliminary)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Preliminary",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "About 6,113 MW of demand response showed up on July 2, 2026, about 3.6% of the estimated peak (own calc: 6,113 / 168,158) [C28]. Verified with nuance: this is PJM's preliminary estimate, and the official count takes 60 days (PJM Inside Lines, 2026-07-10) [C28].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C28",
     "kind": "ledger",
     "source_title": "PJM Inside Lines: PJM Serves Load Through Record-Breaking July Heat (2026-07-10)",
     "source_url": "https://insidelines.pjm.com/pjm-serves-load-through-record-breaking-july-heat/",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 8",
     "page_note_url": "#src-8"
    }
   ]
  },
  {
   "id": "c1e3",
   "parent": "t1e",
   "label": "Prices 'go bonkers'",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC47 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey on the heat dome of 2026: \"Prices go bonkers\" (source conversation, 00:33:14) [TC47]. As stated, not independently verified; our ledger has no price data for those days [TC47].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC47",
     "kind": "transcript",
     "timestamp": "00:33:14",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t2",
   "parent": "root",
   "label": "Voltus and how VPPs work",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus is a curtailment service provider (CSP), the company that signs up customers and bids their cuts into PJM [C16, C17]. A virtual power plant (VPP) is software that links many such sites so they act like one plant. This branch covers Voltus's scale, how it dispatches, and why power and energy differ.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t2a",
   "parent": "t2",
   "label": "Scale",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How big Voltus is, by its own account: capacity it manages, customers and industries served [C05, TC22, TC27]. Most of these are company statements.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c2a1",
   "parent": "t2a",
   "label": "8.5 GW managed (company figure)",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC01 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Managed, not used every day",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"they have about 8.5 gigawatts—8,500 megawatts—of demand flexibility and load flexibility that they control\" (source conversation, 00:01:58) [TC01]. Verified with nuance: the Voltus About page says 8.5 GW of distributed energy resources, but it is capacity Voltus manages, not 8.5 GW used every day, and it is not independently audited [C05].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC01",
     "kind": "transcript",
     "timestamp": "00:01:58",
     "ledger_claim_id": "C05",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C05",
     "kind": "ledger",
     "source_title": "Voltus About page",
     "source_url": "https://www.voltus.co/about",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 13",
     "page_note_url": "#src-13"
    }
   ]
  },
  {
   "id": "c2a2",
   "parent": "t2a",
   "label": "Thousands of customers",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC22 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey, on how many customers: \"Thousands, yeah.\" (source conversation, 00:13:51) [TC22]. As stated, not independently verified; it is a company statement [TC22].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC22",
     "kind": "transcript",
     "timestamp": "00:13:51",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c2a3",
   "parent": "t2a",
   "label": "70-80 verticals",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC27 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"we work with 70, 80 different verticals\" (source conversation, 00:16:40) [TC27]. As stated, not independently verified; it is a company statement [TC27].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC27",
     "kind": "transcript",
     "timestamp": "00:16:40",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t2b",
   "parent": "t2",
   "label": "Dispatch and controls",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How often Voltus calls on its sites [TC02, TC03]. Both points are statements on air, not checked against a dispatch log [TC03].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c2b1",
   "parent": "t2b",
   "label": "Daily, near-hourly dispatch",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC02, TC03 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"they are dispatching every single day, not just in the PJM market\" (00:01:58); Guernsey: \"providing a grid service across North America every single day and approaching every single hour\" (00:11:21) [TC02, TC03]. As stated, not independently verified: Voltus does not say the full 8.5 GW is dispatched daily, and Guernsey later said not every asset is used daily [TC02, C05].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC02",
     "kind": "transcript",
     "timestamp": "00:01:58",
     "ledger_claim_id": "C05",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "TC03",
     "kind": "transcript",
     "timestamp": "00:11:21",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t2c",
   "parent": "t2",
   "label": "Power vs energy",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM's auctions buy capacity, which is power at one moment in kW or MW, not energy, which is power times time in kWh or MWh [C27]. A grid short on capacity cares most about the power. The examples here are illustrative, not measurements [C27, C19].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c2c1",
   "parent": "t2c",
   "label": "Store: 3x power, 15 minutes",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": true,
   "tag_basis": "TC23 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "EXAMPLE",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "EXAMPLE, illustrative numbers, not measurements: Guernsey said a big-box store, \"over the course of a 5-hour dispatch, they might only be able to provide 50 kW, 100 kW; for 15 minutes only, because the cooling load is there, you can get them up to 300 kW\" (source conversation, 00:14:00) [TC23]. Our arithmetic: 100 kW × 5 h = 500 kWh, but 300 kW × 0.25 h = 75 kWh, so three times the power gives less than a sixth of the energy [C27]. As stated, not independently verified [TC23, C27].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC23",
     "kind": "transcript",
     "timestamp": "00:14:00",
     "ledger_claim_id": "C27",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C27",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c2c2",
   "parent": "t2c",
   "label": "Battery site: up to 10x",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": true,
   "tag_basis": "TC24 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "EXAMPLE",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "EXAMPLE, illustrative numbers, not measurements: Guernsey said that with an onsite battery, a commercial site with a 1 MW peak goes from about 100 kW (10-20%) of flexibility to the whole load, \"you're up to now 1 MW of grid flexibility\" (source conversation, 00:15:31) [TC24]. That is up to 10 times as much [TC24, C27]. As stated, not independently verified [C27].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC24",
     "kind": "transcript",
     "timestamp": "00:15:31",
     "ledger_claim_id": "C27",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C27",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c2c3",
   "parent": "t2c",
   "label": "50,000 homes at 2 kW",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": true,
   "tag_basis": "TC37 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "EXAMPLE",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "EXAMPLE, illustrative numbers, not measurements: Guernsey said \"Let's just say on average it's a couple kilowatts, for sake of example\" (source conversation, 00:25:02) [TC37]. At 2 kW of flexible load per home, 50,000 homes add up to 100 MW, and 1 GW is about 500,000 homes (own calc: 1,000,000 kW / 2 kW) [C19]. The arithmetic checks, but 2 kW per home is an assumption; as stated, not independently verified [C19].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC37",
     "kind": "transcript",
     "timestamp": "00:25:02",
     "ledger_claim_id": "C19",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C19",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t2d",
   "parent": "t2",
   "label": "Residential, business, data centers",
   "type": "subtopic",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC55 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus says it manages customer-side resources [C05]. Guernsey: \"we chose to get into residential 5, 6 years ago\" (source conversation, 00:38:45) [TC55]. The timing is as stated, not independently verified [TC55].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC55",
     "kind": "transcript",
     "timestamp": "00:38:45",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t3",
   "parent": "root",
   "label": "Who gets paid, how much",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "PJM pays for capacity, and the CSP passes part of it to customers [C30, C20]; how the money is split, and the margin, are not public. Payouts here are mostly as stated by the speakers; the data-center case is from a Voltus case study [C25, C26, C24].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t3a",
   "parent": "t3",
   "label": "Homes",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "What a household might earn, as Shah described it on air [TC25]. As stated, not independently verified [C25].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c3a1",
   "parent": "t3a",
   "label": "Thermostat ~$25/yr (Shah)",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC25 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah (the host, not Guernsey): \"a homeowner with a smart thermostat might get $25 a year\" (source conversation, 00:15:51) [TC25]. As stated, not independently verified [C25].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC25",
     "kind": "transcript",
     "timestamp": "00:15:51",
     "ledger_claim_id": "C25",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C25",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c3a2",
   "parent": "t3a",
   "label": "Battery: a few hundred $/yr",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC25 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"a homeowner with a home battery might get a few hundred dollars a year\" (source conversation, 00:15:51) [TC25]. As stated, not independently verified [C25].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC25",
     "kind": "transcript",
     "timestamp": "00:15:51",
     "ledger_claim_id": "C25",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C25",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t3b",
   "parent": "t3",
   "label": "Data centers",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Data centers can earn from capacity too, and some now pay for it through Bring Your Own Capacity [C24, C23].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c3b1",
   "parent": "t3b",
   "label": "139 MW earned $11 million",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC26 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Includes backup generation; period not stated",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "A Voltus case study says one PJM data center delivered 139 MW of capacity and earned $11 million, offsetting 87% of its capacity costs [C24]. Shah: \"a data center in the PJM made $11 million in a year for 139 MW\" (source conversation, 00:15:51) [TC26]. Verified with nuance: the 139 MW came from \"load shifting and backup generation\", and the source does not say over what period the $11 million was earned (Voltus blog, 2026-01-12) [C24].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC26",
     "kind": "transcript",
     "timestamp": "00:15:51",
     "ledger_claim_id": "C24; C25",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C24",
     "kind": "ledger",
     "source_title": "Voltus blog: PJM Capacity Auction Results 2027/2028: What C&I Facilities Need to Know",
     "source_url": "https://www.voltus.co/blog/pjm-capacity-auction-results-2027-2028",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 15",
     "page_note_url": "#src-15"
    }
   ]
  },
  {
   "id": "t3c",
   "parent": "t3",
   "label": "Businesses",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "What businesses, meaning commercial and industrial customers, say they save or keep [TC28, TC30]. Both are Guernsey's statements, as stated, not independently verified [C26].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c3c1",
   "parent": "t3c",
   "label": "~20% off spend common",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC28 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"I could say something like 20% off their electricity spend is incredibly common, but we have customers who go up through 50, 60, 70\" (source conversation, 00:16:40) [TC28]. As stated, not independently verified [C26].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC28",
     "kind": "transcript",
     "timestamp": "00:16:40",
     "ledger_claim_id": "C26",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C26",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c3c2",
   "parent": "t3c",
   "label": "Kept a shift, church open",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC30 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey said businesses told Voltus \"we were going to have to lay off a whole shift, but now, now we can keep those people employed,\" and others \"kept their church open because of the payments they received\" (source conversation, 00:18:06) [TC30, C26]. As stated, not independently verified; these are anecdotes [C26].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC30",
     "kind": "transcript",
     "timestamp": "00:18:06",
     "ledger_claim_id": "C26",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C26",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t4",
   "parent": "root",
   "label": "FERC smart-meter fight",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Homes in PJM struggle to join demand response because aggregators can't easily get their smart-meter data [C17]. Voltus and Mission:data took this to FERC (the Federal Energy Regulatory Commission, which oversees wholesale power markets), which granted their complaint in part [C16, C17]. Source: FERC order, Docket EL26-4-000.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t4a",
   "parent": "t4",
   "label": "Complaint and ruling",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "The complaint, the order, and what is still open [C16, C17]. FERC's order was issued July 29, 2026; the replacement rule is in a paper hearing, so it is not final [C17].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c4a1",
   "parent": "t4a",
   "label": "Complaint against PJM, Oct 2025",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC32 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus and Mission:data filed a complaint against PJM at FERC on 2025-10-08, over smart-meter (AMI) data rules, in Docket EL26-4 [C16]. Guernsey: \"our complaint was against PJM\" (source conversation, 00:23:31) [TC32]. Source: FERC order, Docket EL26-4-000 [C16].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC32",
     "kind": "transcript",
     "timestamp": "00:23:31",
     "ledger_claim_id": "C16",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C16",
     "kind": "ledger",
     "source_title": "FERC Order Granting Complaint in Part and Establishing Paper Hearing Procedures, Docket EL26-4-000 (issued 2026-07-29)",
     "source_url": "https://www.pjm.com/-/media/DotCom/documents/ferc/orders/2026/20260729-el26-4-000.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 7",
     "page_note_url": "#src-7"
    }
   ]
  },
  {
   "id": "c4a2",
   "parent": "t4a",
   "label": "Order issued July 29, 2026",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C17 (label is the order date; TC36 is As stated)",
   "show_tag_basis": true,
   "source_label": null,
   "note": "Granted in part",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "FERC's order was issued July 29, 2026, and granted the complaint in part [C17]. On air Guernsey said FERC \"ruled on this on our 10th birthday\" (source conversation, 00:25:02); no date was said, and that remark is as stated, not independently verified [TC36]. Tag basis: the label states the C17 order date from the FERC order, not the on-air remark [C17].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC36",
     "kind": "transcript",
     "timestamp": "00:25:02",
     "ledger_claim_id": "C17",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C17",
     "kind": "ledger",
     "source_title": "FERC Order Granting Complaint in Part and Establishing Paper Hearing Procedures, Docket EL26-4-000 (issued 2026-07-29)",
     "source_url": "https://www.pjm.com/-/media/DotCom/documents/ferc/orders/2026/20260729-el26-4-000.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 7",
     "page_note_url": "#src-7"
    }
   ]
  },
  {
   "id": "c4a3",
   "parent": "t4a",
   "label": "Sampling ban found unjust",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC35 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "FERC found \"it is unjust and unreasonable in these circumstances for PJM to prohibit the use of statistical sampling where a customer has an interval meter and the data is not reasonably accessible\" (FERC order, Docket EL26-4-000, p.28) [C17]. Guernsey (source conversation, 00:23:31): \"how about if the rule was: if you have access to the data, then you use it, and if you don't, then you're allowed to use statistical sampling?\" [TC35]. Verified with nuance: FERC granted the complaint only in part, and the replacement rule goes to a paper hearing (FERC order, Docket EL26-4-000) [C17].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC35",
     "kind": "transcript",
     "timestamp": "00:23:31",
     "ledger_claim_id": "C17",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C17",
     "kind": "ledger",
     "source_title": "FERC Order Granting Complaint in Part and Establishing Paper Hearing Procedures, Docket EL26-4-000 (issued 2026-07-29)",
     "source_url": "https://www.pjm.com/-/media/DotCom/documents/ferc/orders/2026/20260729-el26-4-000.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 7",
     "page_note_url": "#src-7"
    }
   ]
  },
  {
   "id": "c4a4",
   "parent": "t4a",
   "label": "Paper hearing: not final",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C17",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "FERC set a paper hearing on the replacement rule, so the outcome is not final [C17]. The order covers PJM's emergency and pre-emergency load response program (FERC order, Docket EL26-4-000) [C17].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C17",
     "kind": "ledger",
     "source_title": "FERC Order Granting Complaint in Part and Establishing Paper Hearing Procedures, Docket EL26-4-000 (issued 2026-07-29)",
     "source_url": "https://www.pjm.com/-/media/DotCom/documents/ferc/orders/2026/20260729-el26-4-000.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 7",
     "page_note_url": "#src-7"
    }
   ]
  },
  {
   "id": "t4b",
   "parent": "t4",
   "label": "Access barriers",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "What keeps homes out: data access, state rules and who runs the programs [TC33, TC34, TC39, TC40]. FERC found aggregators \"cannot reasonably access residential customers’ interval meter data with the efficiency and scale needed\" [C17]. The other points are as stated, not independently verified.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c4b1",
   "parent": "t4b",
   "label": "10M meters, $6B (unverified)",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC33 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"they even installed 10 million smart meters at a cost of nearly $6 billion\" (source conversation, 00:22:19) [TC33]. As stated, not independently verified: the figures are not in the complaint or the FERC order [C18]. FERC did find aggregators \"cannot reasonably access residential customers’ interval meter data with the efficiency and scale needed\" [C18, C17].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC33",
     "kind": "transcript",
     "timestamp": "00:22:19",
     "ledger_claim_id": "C18",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C18",
     "kind": "note",
     "note_label": "See Sources (Notes section)",
     "note_url": "#notes",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c4b2",
   "parent": "t4b",
   "label": "Illinois opened to residential",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC34 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"Illinois has changed the rules so residential can participate there\" (source conversation, 00:22:19) [TC34]. As stated, not independently verified; not checked [TC34].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC34",
     "kind": "transcript",
     "timestamp": "00:22:19",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c4b3",
   "parent": "t4b",
   "label": "Virginia batteries can't enroll",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC39 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"you can have a backup battery in Virginia right now and you cannot enroll it in your program\" (source conversation, 00:25:46), and Guernsey agreed [TC39]. As stated, not independently verified [TC39].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC39",
     "kind": "transcript",
     "timestamp": "00:25:46",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c4b4",
   "parent": "t4b",
   "label": "Utility-run programs lead",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC40 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey, on where home demand response is most common: \"it's utility territories running utility-run programs\" (source conversation, 00:25:58) [TC40]. As stated, not independently verified; no source was given [TC40].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC40",
     "kind": "transcript",
     "timestamp": "00:25:58",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c4b5",
   "parent": "t4b",
   "label": "~30 million homes in PJM",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC38 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"There's like 30 million homes in PJM\" (source conversation, 00:25:02, repeated at 00:38:45) [TC38]. As stated, not independently verified; PJM says it serves more than 67 million people [C19, C13].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC38",
     "kind": "transcript",
     "timestamp": "00:25:02",
     "ledger_claim_id": "C19",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C19",
     "kind": "note",
     "note_label": "Note 6",
     "note_url": "#src-6",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t5",
   "parent": "root",
   "label": "Bring Your Own Capacity",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Under Bring Your Own Capacity (BYOC), launched September 30, 2025, a data center pays an aggregator to line up accredited capacity from nearby homes and businesses [C23, C20]. Voltus announced a BYOC deal with Google in PJM on June 2, 2026, and it grew in October [C20, C21].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c5a",
   "parent": "t5",
   "label": "BYOC launched Sept 30, 2025",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC49 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus launched Bring Your Own Capacity on September 30, 2025 (Voltus press release, 2025-09-30) [C23]. Shah: \"you guys rolled out a program last year called Bring Your Own Capacity\" (source conversation, 00:34:27) [TC49].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC49",
     "kind": "transcript",
     "timestamp": "00:34:27",
     "ledger_claim_id": "C23",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C23",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Launches “Bring Your Own Capacity” Product to Support Data Center Growth and Grid Resiliency (2025-09-30)",
     "source_url": "https://www.voltus.co/press/bring-your-own-capacity-data-centers",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 14",
     "page_note_url": "#src-14"
    }
   ]
  },
  {
   "id": "t5b",
   "parent": "t5",
   "label": "Google deal",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus announced a three-year BYOC deal with Google in PJM on June 2, 2026, for up to 100 MW of distributed resources each year; it grew on October 22, 2026, after the conversation [C20, C21]. Sources: Voltus press releases.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c5b1",
   "parent": "t5b",
   "label": "Up to 100 MW a year",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC50 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"you announced a big deal with Google around 100 megawatts\" (source conversation, 00:34:27) [TC50]. Verified with nuance: the release says up to 100 MW each year, in a three-year agreement, and the \"Phase One\" wording is not in it (Voltus press release, 2026-06-02) [C20]. It grew by 1,070 MW to about 1 GW on 2026-10-22, after the conversation [C21].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC50",
     "kind": "transcript",
     "timestamp": "00:34:27",
     "ledger_claim_id": "C20",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C20",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus and Google ... Bring Your Own Capacity Agreement (2026-06-02)",
     "source_url": "https://www.voltus.co/press/voltus-google-bring-your-own-capacity-pjm",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 4",
     "page_note_url": "#src-4"
    }
   ]
  },
  {
   "id": "c5b2",
   "parent": "t5b",
   "label": "Hyperscaler contracts '10+ years'",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC56 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": "hyperscaler contracts '10-plus years' (TC56)",
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": "C20: the Google BYOC deal is a three-year agreement",
   "detail": "Guernsey: \"these hyperscaler contracts are 10-plus years in nature\" (source conversation, 00:40:17) [TC56]. As stated, not independently verified. She did not name a deal; the one hyperscaler deal in our sources, Google's, is a three-year agreement [C20].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC56",
     "kind": "transcript",
     "timestamp": "00:40:17",
     "ledger_claim_id": "C20",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C20",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus and Google ... Bring Your Own Capacity Agreement (2026-06-02)",
     "source_url": "https://www.voltus.co/press/voltus-google-bring-your-own-capacity-pjm",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 4",
     "page_note_url": "#src-4"
    }
   ]
  },
  {
   "id": "c5b3",
   "parent": "t5b",
   "label": "Grew by 1,070 MW (~1 GW)",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C21",
   "show_tag_basis": false,
   "source_label": null,
   "note": "After the conversation",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "On October 22, 2026, after the conversation, the Google deal grew by 1,070 MW, to what the companies call about 1 GW (own calc: 100 + 1,070 = 1,170 MW) [C21]. Source: Voltus press release, 2026-10-22.",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C21",
     "kind": "ledger",
     "source_title": "Voltus press release: Google and Voltus Announce One Gigawatt BYOC Agreement (2026-10-22)",
     "source_url": "https://www.voltus.co/press/google-voltus-1gw",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 5",
     "page_note_url": "#src-5"
    }
   ]
  },
  {
   "id": "c5b4",
   "parent": "t5b",
   "label": "Google's own 1 GW DR",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "C22 (company claim)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Company claim",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "The June release says Google also has 1 GW of demand response from its own data centers through utility agreements [C22]. Verified with nuance: it is a company claim, separate from the Voltus deal, and was not said on air (Voltus press release, 2026-06-02) [C22].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C22",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus and Google ... Bring Your Own Capacity Agreement (2026-06-02)",
     "source_url": "https://www.voltus.co/press/voltus-google-bring-your-own-capacity-pjm",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 4",
     "page_note_url": "#src-4"
    }
   ]
  },
  {
   "id": "t5c",
   "parent": "t5",
   "label": "Flex vs on-site gas",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Why a data center might pay for flexibility instead of running its own gas turbines on site [TC52, TC51]. Both points are Shah's, as stated, not independently verified.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c5c1",
   "parent": "t5c",
   "label": "On-site gas: 25-200 h/yr",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC52 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah on on-site gas for a data center: it \"only pencils to turn on 25 hours, maybe 100 hours, maybe 200 hours a year\" (source conversation, 00:36:39) [TC52]. As stated, not independently verified; no source was given [TC52].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC52",
     "kind": "transcript",
     "timestamp": "00:36:39",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c5c2",
   "parent": "t5c",
   "label": "31 turbine types",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC51 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah said some hyperscalers are \"building 31 different types of turbines behind the meter\" (source conversation, 00:34:27) [TC51]. As stated, not independently verified; the claim is unclear and unsourced [TC51].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC51",
     "kind": "transcript",
     "timestamp": "00:34:27",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c5d",
   "parent": "t5",
   "label": "Sunrun and Octopus partners",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC53 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"a pretty high-profile announcement with Sunrun's home batteries and Octopus Energy's smart thermostats and EVs\" (source conversation, 00:38:16) [TC53]. As stated, not independently verified; it is not in our ledger [TC53].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC53",
     "kind": "transcript",
     "timestamp": "00:38:16",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "t6",
   "parent": "root",
   "label": "Money and growth plan",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How Voltus is funded and how far it plans to grow [C01, C06]. Its 20 GW forecast is compared with DOE's estimate for virtual power plants [C34].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "t6a",
   "parent": "t6",
   "label": "The raise",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus raised $225 million in an October 2026 Series D [C01]. The lead and co-leads are confirmed; one name said on air is not in the release [C02, C03].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c6a1",
   "parent": "t6a",
   "label": "$225M Series D",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC04, TC06 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Voltus raised a $225 million Series D, led by Generation Investment Management with co-leads Activate Capital and Vitol (Voltus press release, 2026-10-08) [C01, C02]. Guernsey: \"the round was a $225 million Series D…\" (source conversation, 00:07:28); Shah gave the figure at 00:01:58 [TC06, TC04].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC04",
     "kind": "transcript",
     "timestamp": "00:01:58",
     "ledger_claim_id": "C01",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "TC06",
     "kind": "transcript",
     "timestamp": "00:07:28",
     "ledger_claim_id": "C01; C02",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C01",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    },
    {
     "id": "C02",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    }
   ]
  },
  {
   "id": "c6a2",
   "parent": "t6a",
   "label": "Investors named in release",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC07 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"We had participation from firms uh like All Aboard and Broadscale, Climate Investment, NGP\" (source conversation, 00:07:28) [TC07]. Verified: the release names Broadscale Group, Climate Investment, NGP and All Aboard Fund, plus Ajax Strategies, which was not said on air (Voltus press release, 2026-10-08) [C03].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC07",
     "kind": "transcript",
     "timestamp": "00:07:28",
     "ledger_claim_id": "C03",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C03",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c6a3",
   "parent": "t6a",
   "label": "Salix: not in release",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC08 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey also named \"Salix Ventures\" (source conversation, 00:07:28) [TC08]. As stated, not independently verified: Salix Ventures is not in the Voltus press release [C03]. Its absence is not a contradiction, but we don't print it without a source [TC08].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC08",
     "kind": "transcript",
     "timestamp": "00:07:28",
     "ledger_claim_id": "C03",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C03",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c6a4",
   "parent": "t6a",
   "label": "'Biggest round' in 10 years",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC05 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah called it \"the biggest, biggest round in the company's 10-year history\" (source conversation, 00:04:09) [TC05]. As stated, not independently verified: Latitude Media, a secondary source, says it is Voltus's first raise since a $31 million Series C in 2021, but does not say it is the largest [C04].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC05",
     "kind": "transcript",
     "timestamp": "00:04:09",
     "ledger_claim_id": "C04",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C04",
     "kind": "ledger",
     "source_title": "Latitude Media: Voltus raises $225 million to scale BYOC for data centers (Maeve Allsup, 2026-10-08)",
     "source_url": "https://www.latitudemedia.com/news/voltus-raises-225-million-to-scale-byoc-for-data-centers/",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t6b",
   "parent": "t6",
   "label": "Growth targets",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "What Voltus says it will reach by 2030, from a company forecast to a stretch goal [C06, C07]. Forecasts are not measurements [C06].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c6b1",
   "parent": "t6b",
   "label": "20 GW by 2030 (forecast)",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "TC10 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"you'll see us grow to 20 gigawatts by 2030\" (source conversation, 00:05:57) [TC10]. Verified as a company forecast, not a measurement: the release says Voltus \"anticipates it will grow its platform to 20 gigawatts (GW) by 2030\" (Voltus press release, 2026-10-08) [C06].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC10",
     "kind": "transcript",
     "timestamp": "00:05:57",
     "ledger_claim_id": "C06",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C06",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    }
   ]
  },
  {
   "id": "c6b2",
   "parent": "t6b",
   "label": "PJM-heavy, North America",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC17 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"That includes all of North America, but it's very heavy in PJM\" (source conversation, 00:20:16) [TC17]. As stated, not independently verified: the release ties the 20 GW to BYOC in PJM and MISO, and \"across the U.S. and Canada\" describes Voltus's leadership position, not directly the 20 GW [C38].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC17",
     "kind": "transcript",
     "timestamp": "00:20:16",
     "ledger_claim_id": "C38",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C38",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    }
   ]
  },
  {
   "id": "c6b3",
   "parent": "t6b",
   "label": "'30 by 30' stretch goal",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC54 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"How does that become 30 by 30?\" (source conversation, 00:38:45), meaning 30 GW by 2030 [TC54]. As stated, not independently verified: it is an aspiration, not in any Voltus release, and not a target [C07].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC54",
     "kind": "transcript",
     "timestamp": "00:38:45",
     "ledger_claim_id": "C07",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C07",
     "kind": "note",
     "note_label": "See Sources (Notes section)",
     "note_url": "#notes",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t6c",
   "parent": "t6",
   "label": "Share of DOE estimate",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How Voltus's 20 GW compares with the estimate from DOE (the US Department of Energy) for virtual power plants [C34]. DOE gave a range, not a single target, so the share depends on which end you use [C34]. Source: DOE Office of Technology Commercialization release, 2025-01-10.",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c6c1",
   "parent": "t6c",
   "label": "DOE range: 80-160 GW by 2030",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC12 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": "DOE estimate 80,000 MW by 2030; Voltus 25% of it (TC12)",
   "corrected_value": null,
   "ledger_value": "DOE: 80-160 GW by 2030; Voltus's 20 GW is 12.5-25% (C34)",
   "compare_with": null,
   "detail": "Shah: \"The DOE's uh estimate of where we needed to be was 80,000 MW by uh 2030…\" (source conversation, 00:19:03) [TC12]. Verified with nuance: DOE gave a range, 80-160 GW by 2030, and said it 'could support' load growth; it is not a single target [C34]. 80 GW is the low end, so Voltus's 20 GW would be 12.5-25% of the range [C34].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC12",
     "kind": "transcript",
     "timestamp": "00:19:03",
     "ledger_claim_id": "C08; C34",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C34",
     "kind": "ledger",
     "source_title": "DOE Office of Technology Commercialization release: New Reports From 'Pathways to Commercial Liftoff' Series ... Virtual Power Plants (2025-01-10)",
     "source_url": "https://www.energy.gov/technologycommercialization/articles/us-department-energy-releases-new-reports-highlighting",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 16",
     "page_note_url": "#src-16"
    }
   ]
  },
  {
   "id": "c6c2",
   "parent": "t6c",
   "label": "20 GW = 12.5-25% of DOE",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC11 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"if you had 10% of the entire U.S. grid be flexible, which is what we said in the DOE Virtual Power Plant Liftoff report\" (source conversation, 00:06:37) [TC11]. Verified with nuance: 10% is the low end of DOE's 10-20% of peak load (80-160 GW), so Voltus's 20 GW forecast would be 12.5% to 25% (own calc: 20 / 160; 20 / 80) [C34, C06].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC11",
     "kind": "transcript",
     "timestamp": "00:06:37",
     "ledger_claim_id": "C08; C34",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C06",
     "kind": "ledger",
     "source_title": "Voltus press release: Voltus Raises $225 Million to Make Flexibility Foundational to the Grid (2026-10-08)",
     "source_url": "https://www.voltus.co/press/voltus-series-d-funding",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 11",
     "page_note_url": "#src-11"
    },
    {
     "id": "C34",
     "kind": "ledger",
     "source_title": "DOE Office of Technology Commercialization release: New Reports From 'Pathways to Commercial Liftoff' Series ... Virtual Power Plants (2025-01-10)",
     "source_url": "https://www.energy.gov/technologycommercialization/articles/us-department-energy-releases-new-reports-highlighting",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 16",
     "page_note_url": "#src-16"
    }
   ]
  },
  {
   "id": "c6c3",
   "parent": "t6c",
   "label": "33 GW in North America (Jan 2025)",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C34",
   "show_tag_basis": false,
   "source_label": null,
   "note": "North America",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "DOE, in January 2025: \"Over the last year, VPP scale has grown to 33 GW across North America.\" (DOE Office of Technology Commercialization release, 2025-01-10) [C34]. That is DOE's figure as of that date, not a current count [C34].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C34",
     "kind": "ledger",
     "source_title": "DOE Office of Technology Commercialization release: New Reports From 'Pathways to Commercial Liftoff' Series ... Virtual Power Plants (2025-01-10)",
     "source_url": "https://www.energy.gov/technologycommercialization/articles/us-department-energy-releases-new-reports-highlighting",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 16",
     "page_note_url": "#src-16"
    }
   ]
  },
  {
   "id": "t6d",
   "parent": "t6",
   "label": "Can PJM reach 10 GW?",
   "type": "subtopic",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC16 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah asked (source conversation, 00:19:03): \"is it possible to get to 10,000 MW of flexibility in the PJM?\" [TC16]; Guernsey answered \"For sure\" (00:20:16), an opinion that is as stated, not independently verified [TC16]. For scale, about 7,000 MW of demand response cleared in PJM's 2028/29 auction [C30].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC16",
     "kind": "transcript",
     "timestamp": "00:19:03",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c6d1",
   "parent": "t6d",
   "label": "~7,000 MW DR cleared 2028/29",
   "type": "claim",
   "status": "Verified",
   "example": false,
   "tag_basis": "C30",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "About 7,000 MW of demand response cleared in PJM's 2028/29 capacity auction (PJM 2028/29 BRA report) [C30]. That is about the size of that auction's 6,831.3 MW shortfall, but only as a rough size check: cleared demand response is MW UCAP committed ahead, not a sum with the shortfall [C30, C11].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C30",
     "kind": "ledger",
     "source_title": "PJM 2028/2029 Base Residual Auction Report",
     "source_url": "https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 1",
     "page_note_url": "#src-1"
    }
   ]
  },
  {
   "id": "t7",
   "parent": "root",
   "label": "Politics and affordability",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "The politics around PJM's prices, from the White House to governors' races [C31, C32]. Only the Statement of Principles is checked against a primary source [C31].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c7a",
   "parent": "t7",
   "label": "Statement of Principles, Jan 2026",
   "type": "claim",
   "status": "Verified with nuance",
   "example": false,
   "tag_basis": "TC43 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "A Statement of Principles Regarding PJM, signed in January 2026 by Secretaries Wright and Burgum with all 13 PJM governors, asks to extend the price collar (cap and floor) to the next two auctions [C31]. Guernsey: \"we had the Trump White House issue that statement of principles regarding PJM\" (source conversation, 00:27:36) [TC43]. Verified with nuance: it was signed 2026-01-15/16, and the emergency meeting at the White House said on air is not separately confirmed (DOE, Statement of Principles) [C31, TC43].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC43",
     "kind": "transcript",
     "timestamp": "00:27:36",
     "ledger_claim_id": "C31",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C31",
     "kind": "ledger",
     "source_title": "DOE: Statement of Principles Regarding PJM (signed 2026-01-15)",
     "source_url": "https://www.energy.gov/documents/statement-principles-regarding-pjm",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 10",
     "page_note_url": "#src-10"
    }
   ]
  },
  {
   "id": "c7b",
   "parent": "t7",
   "label": "'Shapiro Cap'",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC44 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"it's now called the Shapiro Cap\" and \"Governor Shapiro was probably the first governor that really got involved in PJM\" (source conversation, 00:27:36) [TC44]. As stated, not independently verified; for context, the cap was $325 per MW-day for 2028/29 [C13].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC44",
     "kind": "transcript",
     "timestamp": "00:27:36",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c7c",
   "parent": "t7",
   "label": "36 governor races",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC41 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"There's 36 governor elections on the ballot\" (source conversation, 00:26:54) [TC41]. As stated, not independently verified; not checked [C32].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC41",
     "kind": "transcript",
     "timestamp": "00:26:54",
     "ledger_claim_id": "C32",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C32",
     "kind": "note",
     "note_label": "See Sources (Notes section)",
     "note_url": "#notes",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c7d",
   "parent": "t7",
   "label": "Virginia plan includes VPPs",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC42 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"Virginia's governor, Abigail Spanberger, put out Virginia's new energy plan, and virtual power plants are in it\" (source conversation, 00:26:54) [TC42]. As stated, not independently verified; not checked [C32].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC42",
     "kind": "transcript",
     "timestamp": "00:26:54",
     "ledger_claim_id": "C32",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C32",
     "kind": "note",
     "note_label": "See Sources (Notes section)",
     "note_url": "#notes",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "t8",
   "parent": "root",
   "label": "Grid economics and reliability",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "How flexibility affects prices and reliability on a stressed grid [TC46, TC48]. These are the speakers' statements; Ting's power-quality data is context only [C45].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c8a",
   "parent": "t8",
   "label": "~10% flex cuts congestion prices",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC46 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey, on flexing load in a congested area to bring prices down: \"You need like 10% for a little bit, and then we can carry on\" (source conversation, 00:33:14) [TC46]. As stated, not independently verified: the mechanism is plausible, but no study was cited [C29].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC46",
     "kind": "transcript",
     "timestamp": "00:33:14",
     "ledger_claim_id": "C29",
     "file": "transcript_claims_v3.csv"
    },
    {
     "id": "C29",
     "kind": "note",
     "note_label": "See Sources (Notes section)",
     "note_url": "#notes",
     "file": "claim_ledger_v7.csv"
    }
   ]
  },
  {
   "id": "c8b",
   "parent": "t8",
   "label": "NJ outages twice a day",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC48 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah, about a friend in New Jersey: \"they lose it like twice a day for like 25 seconds\" (source conversation, 00:34:27) [TC48]. As stated, not independently verified; it is an anecdote, and Ting's power-quality data is not evidence for it [TC48].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC48",
     "kind": "transcript",
     "timestamp": "00:34:27",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c8c",
   "parent": "t8",
   "label": "Ting power-quality data (context)",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "C45 (Ting sensor data, not official utility data)",
   "show_tag_basis": false,
   "source_label": "Ting sensor data, not official utility data",
   "note": "Cite and link only; not used in the body",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Ting sensor data, not official utility data: Ting's Consumer Power Quality Index (CPQI) by utility for September 2026 was reviewed [C45]. Ting shows no link to demand response or the PJM peak, so it is not used in the report's body (cite and link only) [C45]. As stated, not independently verified: it is secondary data from consumer-outlet sensors (Ting Labs, Ting Sensor Network) [C45].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "C45",
     "kind": "ledger",
     "source_title": "Ting Labs, Consumer Power Quality Index - Showing Data by Utility (BY MONTH), Grid Resiliency Data by Ting Labs Ting Sensor Network",
     "source_url": "https://power-quality.tingfire.com/?month=2026_09",
     "file": "claim_ledger_v7.csv",
     "page_note_label": "Note 18",
     "page_note_url": "#src-18"
    }
   ]
  },
  {
   "id": "t9",
   "parent": "root",
   "label": "Future grid (2035)",
   "type": "topic",
   "status": null,
   "example": false,
   "tag_basis": null,
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Where the speakers think the grid is headed by 2035 [TC57]. These are hypotheticals and visions, not checked claims [TC57].",
   "detail_placeholder": false,
   "claims": []
  },
  {
   "id": "c9a",
   "parent": "t9",
   "label": "20% flexible by 2035?",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC57 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Host hypothetical",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Shah: \"when you guys get to 20% of the entire grid being flexible by 2035\" (source conversation, 00:40:58) [TC57]. As stated, not independently verified; it is a host hypothetical, not a target [TC57].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC57",
     "kind": "transcript",
     "timestamp": "00:40:58",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c9b",
   "parent": "t9",
   "label": "AI orchestration: a vision",
   "type": "subtopic",
   "status": null,
   "example": false,
   "tag_basis": "TC62 (transcript_claims_v3)",
   "show_tag_basis": false,
   "source_label": null,
   "note": "Vision, not a claim",
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey (source conversation, 00:41:44): \"This is, this is also a phenomenal use case for AI itself.\" [TC62]. It is a vision, not a factual claim: as stated, not independently verified, with nothing to check [TC62].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC62",
     "kind": "transcript",
     "timestamp": "00:41:44",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  },
  {
   "id": "c9c",
   "parent": "t9",
   "label": "Voltus 10 years old",
   "type": "claim",
   "status": "As stated, not independently verified",
   "example": false,
   "tag_basis": "TC45 (transcript_claims_v2)",
   "show_tag_basis": false,
   "source_label": null,
   "note": null,
   "stated_value": null,
   "corrected_value": null,
   "ledger_value": null,
   "compare_with": null,
   "detail": "Guernsey: \"we've been building\" Voltus for 10 years, and she has been in the industry for 20 years (source conversation, 00:29:56) [TC45]. As stated, not independently verified; Voltus's founding date is not verified [TC45, TC36].",
   "detail_placeholder": false,
   "claims": [
    {
     "id": "TC45",
     "kind": "transcript",
     "timestamp": "00:29:56",
     "ledger_claim_id": null,
     "file": "transcript_claims_v3.csv"
    }
   ]
  }
 ]
}